Laserfiche WebLink
1 <br />n <br />.~~ <br />Waste Haulage To Local Landfill ~,~ <br />190 tons of unsalvageable materials hauled 25 miles S 712. <br />g ~,~,~ @ 50.15 per ton mile <br />'V d ~ /// <br />ContamLnated waste Haulage to Canon City Mill ~IS {4.vi ~~(~1~ S-~~(~ <br />60 tons hauled 145 miles @ 50.15 per ton mile ~ ~ ~ -X51,305. <br />7 WfMi~ -ta <br />n„~r,-e . <br />E3o rehole Seal:nq ` ~O`o~ "~^'~~i <br />Concrete 3 cu. yds. 3 k3oreholes % $52.50/cu. yd. $ 472. <br />Miscellaneous costs ~g~,-~tAI S~~n.(-(-s S 175. <br />Labor 90 hrs. @ 512.00/hr. , L`d ~'~ `~-^-`E ~)"'~7`~ $1,080. <br />Bonevard Clean-u <br /> <br />alpha survey 46 hre. @ $12.00/h r. - ~e,,~s ~`{ ~~ ~s 5 552. <br />Supervise salvage and special handling 185 hre. ® $12.00/hr 52,220. <br />Labor 90 hrs. @ 512.00/hr. 51,080. <br />Equip ment Expense <br /> Dismantle and salvage buildings <br /> Crane (80 ton) 260 hrs. @ S165.00/hr. 542,500. <br />y <br />~ <br />~ <br />~ <br />1i'~ <br />~ <br />kti ~ 966 Loader 235 hrs. <br />@ <br />S 60.00/hr• <br />514,100. <br />~S <br /> D-7 Dozer 115 hrs. @ 5120.00/hr. 513,800. <br />Remove fuel tanks and grade boneyard <br />966 Loader 45 hrs. @ $60/hr. S 2,700.0 <br />Crane (80 ton) 15 hrs. @ 5165/hr. S 2,475.0 <br /> <br /> <br />