Laserfiche WebLink
- r <br />. ,. <br />1 - -•----ulyli <br />e"~ `-" ~-•,~ ~ mac- ~ .. ~ ~ <br />i <br />~~ Exhibit L - Reclamation Co s C ~I. <br />~;1~ <br />The determination of the reclamation costs for the Schwartzwalder Mine l`~ <br />is based on the following assumptions. <br />1) Costs have been determined assuming the work will be done: by an <br />outside contractor. <br />2) Facilities licensed separately (Ore Sorter, Water Treatment Plant <br />and Transfer Pad) have individual bonds and have riot been addxeased <br />3) All costa have been baaod on Fobruary 1993 conditions. <br />4) Salvayo returns have not been d~ductrd from reclamation c~»ee. <br />5) Tlie following is a list of facilities to ba decomrtiissione~i and <br /> <br />reclaimed: <br />a) Uld Water Treatmunt Plant _ -~~~~5«,s ~G.,r~a.,yrkw~-Eu.,2~ <br />b) Shopy ~~ !^^D'u.~.c~`.o-~iG~•. _~_ 1~on-t-~.v`~~ <br />i) Weldiny <br />ii) Mechanic <br />iii) Electric <br />iv) Ventilation <br />` c) Warehouse r~, <br />///J d) Office and Change Room <br />e) Compressor Sheds <br />t) Guard Shack r'I <br />L <br />g) Substations <br />h) Ventilation Bore Holes (1 ' r <br />i) Boneyard Y jN ' <br />'~. <br />j) Core Shed t` <br />~~ ~ ~~ <br />~J <br />`//~`\ .~ <br />