Laserfiche WebLink
<br /> <br /> <br /> <br />EXHIBIT L - Reclamation C~~sts <br />The costs listed in Table L-1 are "best estimates" based <br />upon the current reclamation technology at 1977 costs. <br />TABLE L-1 <br />Reclamation Costs <br />Operation <br />Removal of Buildings and Other Structures <br />Mine Sealing <br />Ad its <br />Shafts <br />Construction of Diversion Channel <br />Soil Material <br />Clay (delivered and compacted) <br />Topsoil (delivered and spread) <br />Mulching <br />Native Hay <br />Application <br />Oiscing <br />Seed <br />Seeding Operations <br />Tractor and Drill <br />Broadcast <br />Maintenance <br />Fertilizer & Weed Control <br />Application <br />TOTAL RECLAMATION COSTS <br />$50,000 <br />7,200 <br />22,600 <br />50,000 <br />3,600 <br />1,000 <br />500 <br />500 <br />750 <br />1,500 <br />1,500 <br />Cost <br />$ 40,000 <br />57,200 <br />3,000 <br />72,600 <br />5,100 <br />1,000 <br />1,250 <br />3,000 <br />X83,150 <br /> <br />