Reclamation Timetable <br />• The operation of the Schwartzwalder Mine will not cause an in- <br />crease in the amount of affected land above that which is listed in <br />Exhibit A. However, it must be noted that all areas described in <br />Exhibit A are essential to the operation of the mine; therefore, the <br />timetable for the reclamation phase of operation will not begin until <br />the completion of mining operations. <br />The disposal of refuse and decommissioned equipment will continue <br />throughout the mining operation. Upon completion of mining 311 refuse <br />and equipment will have been removed from the site. <br />Depending upon the time of year when mining operations :eases, <br />the reclamation operation will be conducted so that all buildings and <br />concrete structures have been removed in time to permit application and <br />grading of topsoil during the early spring months. Seedbed ~~reparation <br />• and seeding will follow. It is estimated that site preparation prior to <br />the application of topsoil material will require approximately three <br />to four months. <br />f4ine sealing operations will commence as soon as all equipment <br />has been removed from the mine workings. It is estimated th~~t mine <br />sealing operations will require approximately three months. <br />The regrading operations at the waste dump are an integral part <br />of the mining operation. Therefore the waste will be shaped and <br />stabilized throughout the remaining life of the mine. Upon ~:ompletion <br />of mining and weather conditions permitting, the clay soil m+iterial <br />will be hauled to the site, spread over the dump area, and compacted. <br />Additionally, construction of the diversion channel will then begin. <br />C, <br />J <br />E-16 <br />