My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133656
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:19 PM
Creation date
11/26/2007 1:25:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Permit File
Doc Date
9/30/1978
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The old water treatment plant evaporation pond will be backfilled <br />• and regraded to a 3:1 slope and will conform to the surrounding contours. <br />This area will then be seeded and fertilized with the mixture specified <br />below. <br />R71W, T2S, SW1/4 SE1/4 - The adits will be closed using the method <br />described above. The borehole/adit access road link will be graded to <br />insure that the road base maintains a flat cross-sectional appearance <br />with a crossslope grade between 10-12~. The roadbed will then be scarified, <br />seeded and fertilized. The road will not be regraded to conform to the <br />surrounding terrain at the request of the landowner and in the interest <br />of fire truck access. <br />The ventilation borehole and ventilation system sites will undergo <br />a series of reclamation procedures. All equipment will be dismantled <br />and removed from the sites. Tlie ventilation shafts will be plugged and <br />• backfilled using the method described above. The sites will be regraded <br />to a flat contour, which conforms to the terrain surround them, seeded <br />and fertilized. <br />R7141, T2S, SEl/4 SE1/4 - All buildings or structures located at the <br />equipment maintenance area, equipment storage area, supply warehouse and <br />ore sorter will be dismantled and removed from the site. All sites, <br />except the abandoned ore sorter site, will be regraded to a flat contour. <br />The abandoned ore sorter site will be regraded to a slope of about 3:1 <br />which conforms with the surrounding terrain. The areas will then be <br />covered with topsoil seeded and fertilized. <br />Tlie site access road link will be graded to insure a flat cross- <br />sectional grade, scarified, seeded and fertilized. <br />• E-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.