Laserfiche WebLink
Runoff Pond No. 1 <br />(MB#1) <br /> BID SCHEDULE (Continued) <br /> <br />~ Description, Approximate Quantity and Unit and Lump Sum <br />tem No. Price in Words and Figures Total Price <br />11. Outlet pipe energy dissipator, complete in place, including S <br /> concrete, steel and all other miscellaneous items at a <br /> lump sum price of Dollars <br /> and Cents. <br /> Approximate Quantities: <br /> Concrete: 6.52 cubic yards <br /> Reinforcing Steel: 346 pounds <br />12. Inlet pipe energy dissapator, complete in place, including $ <br /> steel and concrete at a lump sum price of <br /> Dollars and -Z`,ents. <br /> Approximate Quantities: <br /> Concrete: 27.5 cubic yards <br /> Reinforcing Steel: 1,666 pounds <br />13. Concrete outlet pipe, complete in place, including anti- 5 <br /> seep collar, cradle, compaction, pipe and other incidentals <br /> required, at a lump sum price of <br /> Dollars and Cents. <br />- Approximate Quantities: <br /> Concrete: II.B cubic yards <br />-- Reinforcing Steel: 1,400 pounds <br />_ 18" p Concrete Pipe: 90 linear feet <br />14. Ductile iron pipe, (transfer line to transfer control structure) <br />complete in place, including pipe and antiseep collars at a <br />lump sum price of Dollars and <br />Cents. <br />Approximate Quantities: <br />Concrete: 2.43 cubic yards <br />Reinforcing Steel: 290 pounds <br />8" 0 Ductile iron pipe: 220 linear feet <br />TOTAL COST IN WORDS: <br />DOLLARS AND CENTS <br />TOTAL COST IN FIGURES: S <br />The estimated quantities listed above are provided to assist the Contractor in assessing <br />the scope of each lump sum item. These quantities are the Engineer's estimated <br />quantities and should be considered approximate only. The Contractor shaIl verify aII <br />• quantities and satisfy himself as to the actual quantities required to construct these <br />facilities as indicated on the drawings. <br />