Laserfiche WebLink
~ •. <br />it <br />~. <br />~L <br />Runoff Ponds (YIB#1, MB#2, and iV1B#3) <br />Freshwater Pond (FW #1) <br />In the event that the scope of any one work item of the project changes significantly ( a <br />significant change would be an increase or decrease of 10% or greater in the quantity of <br />any one item), the following unit prices will be used where applicable. <br />TABLE OF UNIT PRICES <br />Add-on and Deletion <br />Item Unit Price <br />1. Common Excavation at the price of Dollars $ <br />and Cents ($ -~ per cubic yard. <br />2. Backfill and compaction of Type 1 :material, complete in $_ <br />place, to 95% Standard Proctor Density at the price of <br />Dollars and Cents <br />($ )per cubic yard. <br />3. Backfill and compaction of Type 2 material, complete in $ <br />place, to 95% of maximum Standard Proctor Density at the <br />price of Dollars and <br />Cents ($ )per cubic yard. <br />9. Rock excavation at the price of Dallars $ <br />and Cents ($ per cubic yard. <br />5. 6" perforated PVC (SDR 35) toe drain pipe, in place, including$ __ <br />pipe and filter materials at the price of <br />Dollars and _ Cents ($ _ per <br />cubic yard. <br />6. Class III riprap, complete in glace, at the price of $ <br />Dollars and Cents <br />($ )per cubic yard. <br />7. Type 3 filter material, complete in place, at the price of $ <br />Dollars and <br />Cents $ )per cubic yard. <br />8. Type 4 filter material, complete in place, at the price of $ <br />Dollars and <br />Cents ($ )per cubic yard. <br />9. Filter fabric, complete in place, at the price of $ <br />Dollars and Cents <br />($ )per square yard. <br />:, 10. 4" Perforated PVC dewatering system, complete in place, $ <br />including pipe, filter sand and filter fabric at the price of <br />Dollars and <br />Cents ($_ }per linear foot. <br /> <br />