Laserfiche WebLink
i <br />~. <br />I <br />I <br />I <br />i <br />I <br />(~ <br />I <br />Runoff Pond No. 1 <br />(MB~i) <br />BID SCHEDIILE (Continued) <br />Description, Approximate Quantity and Unit and Lump Sum <br />Item No. - Price in Words and Figures Total Price <br />6. Riprap pond lining, complete in place, including rock and $ <br />filter material at a lump sum price of <br />Dollars and Cents. <br />Approximate Quantities: <br />Riprap: 1,968 cubic yards <br />Filter Fabric: 3,564 square yards <br />7. Spillway and spillway channel, complete in place, including $ <br />all excavation, backfill and compaction, rip rap and filter <br />fabric at a lump sum price of Dollars <br />and Cents. <br />Approximate Quantities: <br />Excavation: 6,390 cubic yards <br />BackfilL• 168 cubic yards <br />Riprap: 1,537 cubic yards <br />Filter Fabric: 2,556 square yards <br />Concrete in Cutoff: 18.2 cubic yards <br />Reinforcing in Cutoff: 624 pounds <br />8. Dewatering system in pond bottom, complete in place, in- $ <br />eluding pipes, sand, and filter fabrics at a lump sum price <br />of Dollars and Cents. <br />Approximate Quantities: <br />Filter Fabric: 56 square yards <br />Clean sand backfill: 110 cubic yards <br />4" 9 Perforated PVC: 479 linear feet <br />6" 0Non-perforated PVC: 302 linear feet <br />9. Control tower structure, complete in place, including con- $ <br />Crete, reinforcing, gates, grates and other miscellaneous <br />- items to complete this item at a lump sum price of <br />Dollars and Cents. <br /> <br /> <br />Approximate Quantities: <br />Concrete: 32.0 cubic yards <br />Reinforcing Steel: 2,330 pounds <br />Gates, grates and Miscellaneous Items: See Drawings <br />10. Timber service bridge, complete in place, including all tim- $ <br />ber and all miscellaneous items necessary to complete the <br />work, at the lump sum price of Dollars • <br />and Cents. <br />Approximate Quantities: See Drawings <br />