Laserfiche WebLink
• <br />TABLE 2.2-1S <br />PERMIT AREA <br />CONSTRUCTION AND DISTURBANCE TIMING <br />(Continued) _ <br /> SCHEDULED SCHEDULED <br /> START COMPLETION REFERENCE <br />PROJECT YEAR-QUARTER YEAR-QUARTER DISTURBED AREA SECTION <br />4. WASH PLANT <br />200 TPH Plant 3-2 3-4 2.75 2.3.3.4 <br />Slurry Ponds 3-2 3-4 2.75 2.3.5.1 <br />5. REFUSE AREA <br />Refuse Area 3-2 3-4 6.55 2.4.2.1 <br />Sediment Pond 3-3 3-4 0.50 2.4.6.2 <br />Refuse Area Access Road 2-3 2-4 9.08 2.4.5 <br />Revised: 6/8/84 <br />