Laserfiche WebLink
<br /> TABL E 2.2-15 <br /> PER MIT AREA <br /> CONSTRUCTION AN D DISTURBANCE TIMING <br /> (From Start of Construction) <br /> SCHEDULED SCHEDULED <br /> START COMPLETION REFERENCE <br />PROJECT YEAR-QUARTER YEAR-QUARTER DISTURBED AREA SECTION <br />1. MINE SITE FACILITIES <br />Water Tanks 2-2 2-2 0.06 2.3.1 <br />Surge Bin 2-2 2-3 Previous Submittal 2.3.3.1 <br />Belt to Central (Conveyor) 2-2 3-1 2.3.3.1 <br />Mine Septic System 2-1 2-1 Previous Submittal 2.3.1 <br />2. CENTRAL FACILITIES AREA <br />Main Office 2-2 2-3 0.55 2.3.1 <br />Bathhouse ~/1 3-3 3-4 0.45 2.3.1 <br />Bathhouse /~2 4-3 4-4 0.47 2.3.1 <br />Warehouse fi Shop 3-3 4-1 0.55 2.3.1 <br />Supply Yard 3-3 3-4 2.3.2.3 <br />Fresh Water Ponds 3-3 3-3 1.38 2.3.1 fi 2.3.5 <br />Water System 3-3 3-3 Inclusive to Ponds 2.3.1 <br />Parking Lot ~J1 1-2 1-3 0.73 2.3.1 <br />Parking Lot J~2 2-2 2-3 0.73 2.3.1 <br />Parking Lot p3 4-2 4-3 0.73 2.3.1 <br />Parking Lot ~~4 5-2 5-3 0.73 2.3.1 <br />Sediment Pond 1-3 1-4 2.3.5 <br />Sewage Treatment 2-2 2-4 0.11 2.3.1 <br />McClane Interconnect Road & Con- <br />veyor 4-2 4-4 2.3.3.1 <br />3. COAL HANDLING FACILITIES <br />Rotary Breaker fi Prescreen 2-3 2-4 Inclusive to Stockpile 2.3.3.2 <br />Stockpile Area 2-2 2-3 2.3.3.3 <br />Reclaim Conveyors 2-2 2-3 Inclusive to Stockpile 2.3.3.5 <br />Coal Loadout 2-3 2-4 Inclusive to Stockpile 2.3.3.5 <br />Revised: 6/8/84 <br />