Laserfiche WebLink
• TABLE 2.3-15 <br />WATER CONSUMPTION <br />19 CM shiftsJday - 300 min/shift, 25 gpm <br />Belt Transfers - 22 ea, 450 min/shift, 1 gpm, <br />3 shifts/day <br />Dust Control (Underground) - 4 mile roads, <br />4 yd. wide, 28,160 yd2, <br />w/0.5 gal/yd2 ~ 2 waterings/wk <br />200 TPH Wash Plant - 83 gpm make-up, <br />3 x 450 min/day <br />Dust Control (Surface) - Figure 3 mile roads <br />6 yd wide, 2 applications/day <br />@ 0.5 gal/yd2 <br />Bathhouse - 400 ee's w/15 gpd shower <br />50 ee's w/35 gpd use <br />• <br />142,500 gpd <br />29,700 gpd <br />4,000 gpd <br />112,050 gpd <br />10,560 gpd <br />6,000 gpd <br />1,750 Rpd <br />E = 306,560 gpd <br />Add lOZ = 30,656 gpd <br />Total = 337,216 gpd <br />Use = 337,200 gpd <br />@ 24 hr/day = 234.2 gpm <br />= 0.52 cfs <br /> <br />