Laserfiche WebLink
<br />Table L-1 GCC Rio Grande Portland Cement Quantity Takeoff and Draft Cost Summary <br />DESCRIPTION MATERIAL DIMENSIONS (Ft) QUANTITY UNIT $IUNIT COST ($) <br />Clinker vent Superstructure 108.2'29.5'55.7 177,788 CF $0.13 $22,935 <br />Clinker vent concrete Floor Concrete 108.2'29.5'1 3,192 CF $2.65 $8,452 <br />Bucket conveyor #1 Superstructure 280.5"6'8 13,464 CF $0.13 $1,737 <br />100,000 S.T. Clinker silo Superstructure (51.7'39.4'39.4)+((1/3)'PI()`(128)^2`(93.5)) 1,684,463 CF $0.13 $217,296 <br />Tunnel Concrete (16078(tunnel)+5984(emergency tunnel)+10528( 37,447 CF $2.65 $99,160 <br />562 S.T. Unburnt clinker silo Superstructure (PI()'(6"2)'13.5) 1,527 CF $0.13 $197 <br />562 S.T. Unburnt clinker silo floor Concrete ((PIQ'6^2)`1) 113 CF $2.65 $299 <br />Bucket conveyor#2 Superstructure (285.4'6'8)+((253.4'12.3'4.3)-(253.4"11.3'3.3)) 17,652 CF $0.13 $2,277 <br />Gypsum receiving hopper and Conveyors Superstructure (6.6'75.5'1)+(((7.4`36.9)l2)`32.8)+(29.5'13.1`1} 10,655 CF $D.13 $1,375 <br />Gypsum receiving hopper underground vault Concrete (40'29.5'15)-(23.6'23.6'11.5)+((85'6.6'3.3)-(95' 12,140 CF $2.65 $32,148 <br />3,000 S.T. Gypsum storage and Conveyor Superstructure ((PIQ'(6.6"2))'19.7)+((1/3)'(PIQ'(34"2))`35.3)+(• 49,013 CF $0.13 $6,323 <br />3,000 S.T. Gypsum storage and conveyor <br />underground vault Concrete (((1/3)`(PI()'(26"2))'23)-((1/3)'(PIQ'(25"2))'23)+ 15,599 CF $2.65 $41,306 <br />Clinker and Gypsum bucket elevator Superstructure (((32'42'128)'2))+(((1/3)'2.5`(32'42))'2)+(22'10 416,937 CF $0.13 $53,785 <br />Clinker and Gypsum bucket elevator Floor Concrete ((32`42'1)'2)+((2.5'5'5)'4) 2,938 CF $2.65 $7,780 <br />Finish mill feed bins and cement grinding Superstructure (82'57`98)+(24.6'57'108.3)+((1/3)`(81'S7)'7.4)a 655,373 CF $0.13 $84,543 <br />Finish mill feed bins and cement grinding Floor Concrete (106.6`57'i)+((2.5'5'5)'12)+(24.6`24.6"i) 7,431 CF $2.65 $19,678 <br />Air slide conveyor Superstructure (111'12.3'13.5) 18,432 CF $0.13 $2,378 <br />1 X 10,000 S.T. cement storage and cement <br />bucket elevator Superstructure (PI()'(27^2)`211.6) 484,611 CF $0.13 $62,515 <br />1 X 10,000 S.T. cement storage and cement <br />bucket elevator floor Concrete ((PIO'27^2)'1) 2,290 CF $2.65 $6,065 <br />Truck and rail loadout Superstructure (37'37'61.5)+(((1/3)`(37'37)'(7.4))/2) 85,882 CF $0.13 $11,079 <br />Truck and rail loadoutfloor Concrete (37"37`1) 1,369 CF $2.65 $3,625 <br />Raw recycle bin Superstructure 49'39 `98 187,278 CF $0.13 $24,159 <br />Raw recycle bin Floor Concrete 0.67'49'39 1,280 CF $2.65 $3,390 <br />LS feed transfer point 8 Gammametric Superstructure 32.8"49'24.6 39,537 CF $0.13 $5,100 <br />LS feed transfer point & G concrete floor Concrete 0.67'32.8"24.6 541 CF $2.65 $1,432 <br />Office Construction Superstructure (((105'157.5)-(32.8'157.5))'26)+(((pIQ`92)`29.5; 300,775 CF $0.13 $38,800 <br />Office Floor Concrete ((105'157.5)-(32.8'157.5))+((PIQ`92)`0.6) 11,545 CF $2.65 $30,571 <br />Concrete Disposal Concrete Total of all concrete rubble 154,917.48 CF $0.20 $31,293 <br />Superstructure Disposal Superstructure One-tenth of all superstructure 1,123,608.652 CF $0.20 $226,969 <br />Demolish and Remove Asphalt Asphalt 594' x 158' 93,852.00 SF $4.70 $441,104 <br />RevegetaCron-25 /o Failure Rate Gradinglspread topsoil 111,320 CY $ 0.63 $70,132 <br /> Fertilize,Seed, Mulch 59 ACRE $ 512.72 $30,250 <br /> PLANT SUBTOTAL $2,831,592 <br />L-4 7-OS-02 <br />