Laserfiche WebLink
• <br />Table L-1 GCC Rio Grande Portland Cement Quantity Takeoff and Draft Cost Summary <br />DESCRIPTION MATERIAL DIMENSIONS (Ft) QUANTITY UNIT $IUNIT COST ($) <br /> <br /> <br />IRAI@ROAD SPUR~-~.r- ~ ~ <:,. <br />_' <br />Railroad Corridor Steel Track 20,000.00 LF $6.11 $122,200 <br />Ballast 1 CY per LF+C7 20,000.00 LF $2.68 $53,600 <br />Revegetation-25% Failure Rate Grading/spread topsoil 9260x200x1 62,920.00 LCY $ 0.63 $39,640 <br />Fertilize,Seed, Mulch 9260x200 39.00 ACRE $ 512.72 $24,995 <br /> RAILROAD SPUR SUBTOTAL $240,435 <br />ARROYO R <br />ESTORA'TION ~_ _"^ <br />~ <br />_ <br />_ <br />Scraper fill work ~ Grading 883,710.00 LCY $ 0.63 $556,737 <br />Revegetation-25°J° Failure Rate Spread topsoil 43,560.00 LCY $ 0.63 $27,443 <br />Fertilize,Seed, Mulch 27 ACRE $ 512.72 $17,304 <br /> ARROYO SUBTOTAL $601,464 <br />RED ROCK QUARRY-Final P,if,z m~`_:~; <br />Bulldozer work Grading ((2600x10.1)+(900x12.2 )+(2200x12.2)+(1500x1`< 35,985.78 LCY $ 0.43 $15,474 <br />Revegetation-25% Failure Rate Grading/spread topsoil 9260x200x1 30,653.33 LCY $ 0.63 $19,312 <br />Ferlilize,Seed, Mulch 9260x200 19 ACRE $ 512.72 $12,177 <br /> CONVEYOR CRUSHER AND CORRIDOR SUBTOTAL $46,963 <br />CONVEYOR:CRUSHER.AND,CORRIDOR w <br />~~ ~ <br />Crusher <br />Steel Frame 12' x 40' x 40' 40 LF $12.26 $490 <br />Conveyors <br />1 Steel Frame 1000' x 6' x 8' 1,000.00 LF $12.26 $12,260 <br />2 Steel Frame 675' x 6' x 8' 675.00 LF $12.26 $8,276 <br />3 Steel Frame 300' x 6' x 8' 300.00 LF $12.26 $3,678 <br />4 Steel Frame 300' x 6' x 8' 300.00 LF $12.26 $3,678 <br />Revegetation-25% Failure Rate Grading/Backfill 660,555.56 LCY $ 0.43 $284,039 <br />Spread topsoil 28,233.33 LCY $ 0.63 $17,787 <br />Fertilize,Seed, Mulch 19 Acres 17.5 ACRE $ 512.72 $11,216 <br /> RED ROCK QUARRY SUBT OTAL $341,424 <br />~TOTAL_ESTIMA'CE-directcosts $4,061,897 <br />ABBREVIATIONS <br />CF Cubic Feet LCY Loose Cubic Yard ~, <br />SF Square Feel CY Cubic Yard '~, <br />LF Linear Feet SY Square Yard i <br />L-5 7-08-02 <br />