<br />Table L-1 GCC Rio Grande Portland Cement Quantity Takeoff and Draft Cost Summary
<br />DESCRIPTION MATERIAL DIMENSIONS (Ft) QUANTITY UNIT $IUNIT COST ($)
<br />
<br />
<br />IRAI@ROAD SPUR~-~.r- ~ ~ <:,.
<br />_'
<br />Railroad Corridor Steel Track 20,000.00 LF $6.11 $122,200
<br />Ballast 1 CY per LF+C7 20,000.00 LF $2.68 $53,600
<br />Revegetation-25% Failure Rate Grading/spread topsoil 9260x200x1 62,920.00 LCY $ 0.63 $39,640
<br />Fertilize,Seed, Mulch 9260x200 39.00 ACRE $ 512.72 $24,995
<br /> RAILROAD SPUR SUBTOTAL $240,435
<br />ARROYO R
<br />ESTORA'TION ~_ _"^
<br />~
<br />_
<br />_
<br />Scraper fill work ~ Grading 883,710.00 LCY $ 0.63 $556,737
<br />Revegetation-25°J° Failure Rate Spread topsoil 43,560.00 LCY $ 0.63 $27,443
<br />Fertilize,Seed, Mulch 27 ACRE $ 512.72 $17,304
<br /> ARROYO SUBTOTAL $601,464
<br />RED ROCK QUARRY-Final P,if,z m~`_:~;
<br />Bulldozer work Grading ((2600x10.1)+(900x12.2 )+(2200x12.2)+(1500x1`< 35,985.78 LCY $ 0.43 $15,474
<br />Revegetation-25% Failure Rate Grading/spread topsoil 9260x200x1 30,653.33 LCY $ 0.63 $19,312
<br />Ferlilize,Seed, Mulch 9260x200 19 ACRE $ 512.72 $12,177
<br /> CONVEYOR CRUSHER AND CORRIDOR SUBTOTAL $46,963
<br />CONVEYOR:CRUSHER.AND,CORRIDOR w
<br />~~ ~
<br />Crusher
<br />Steel Frame 12' x 40' x 40' 40 LF $12.26 $490
<br />Conveyors
<br />1 Steel Frame 1000' x 6' x 8' 1,000.00 LF $12.26 $12,260
<br />2 Steel Frame 675' x 6' x 8' 675.00 LF $12.26 $8,276
<br />3 Steel Frame 300' x 6' x 8' 300.00 LF $12.26 $3,678
<br />4 Steel Frame 300' x 6' x 8' 300.00 LF $12.26 $3,678
<br />Revegetation-25% Failure Rate Grading/Backfill 660,555.56 LCY $ 0.43 $284,039
<br />Spread topsoil 28,233.33 LCY $ 0.63 $17,787
<br />Fertilize,Seed, Mulch 19 Acres 17.5 ACRE $ 512.72 $11,216
<br /> RED ROCK QUARRY SUBT OTAL $341,424
<br />~TOTAL_ESTIMA'CE-directcosts $4,061,897
<br />ABBREVIATIONS
<br />CF Cubic Feet LCY Loose Cubic Yard ~,
<br />SF Square Feel CY Cubic Yard '~,
<br />LF Linear Feet SY Square Yard i
<br />L-5 7-08-02