Laserfiche WebLink
<br />Table L-1 GCC Rio Grande Portland Cement Quantity Takeoff and Draft Cost Summary <br />DESCRIPTION MATERIAL DIMENSIONS (Ft) QUANTITY UN{T $IUNIT COST ($) <br />REDsROCfC CEMENT.RLANT ;._ ~ sv;__j <br />Overland Limestone belt conveyor Superstructure 873'6'8 41,904 CF $0.13 $5,406 <br />25,000 S.T. Limestone Storage Superstructure (15204.02`PI()'(12)^2)/3 2,292,712 CF $0.13 $295,760 <br />25,000 S.T. LS storage interior structure Superstructure (14.8'98.4"14.8)+(16.4'16.4'72.2)+(3.28'6'78.7; 42,521 CF $0.13 $5,485 <br />25,000 S.T. Limestone storage Underground <br />Vault Concrete (41"41'31.2)-(40`40"30.2) 4,127 CF $2.65 $10,929 <br />Concrete Floor Concrete PIQ'(12)^2`0.67 303 CF $2.65 $803 <br />Materials Storage <br />2,500 S.T. Sandstone <br />5,000 S.T. Coal & 4,000 S. T. Iron Ore Superstructure 475.72'72.2`1 4.1 484,293 CF $0.13 $62,474 <br />Concrete Floor Concrete 475.72'45.9`0.67 14,630 CF $2.65 $38,740 <br />Coal and Raw materials rece~ving hopper Superstructure 34.5`22'37 28,083 CF $0.13 $3,623 <br />Coal and Raw materials receiving hopper underground <br />vault Concrete (19.7'27'36)-(18.7'26`35) 1,221 CF $2.65 $3,234 <br />Coal and Raw materials belt conveyor Superstructure (253.4'6'8)+((163.6'13.5'12)-(163.6'12.5"11)) 16,171 CF $0.13 $2,086 <br />Raw Materials belt conveyor -Stacker Superstructure 328.5'6'8 15,768 CF $0.13 $2,034 <br />Raw Materials belt conveyor-Reclaim Superstructure (318.9`6`8)+((223.1`10`12)-(223.1`9`11)) 19,992 CF $0.13 $2,579 <br />Coal belt conveyor #1 Superstructure 836`6`8 40,128 CF $0.13 $5,177 <br />Coal belt conveyor #2 Superstructure (579'6`8)+(13'13 X 79) 41,143 CF $0.13 $5,307 <br />Raw feed bins Superstructure 39'168`64 419,328 CF $0.13 $54,093 <br />Raw feed bin concrete Floor Concrete 0.67'39'64 1,672 CF $2.65 $4,428 <br />Raw mix belt conveyor Superstructure 320"6"8 15,360 CF $0.13 $1,981 <br />Raw grinding Superstructure (39`39'37)+(57'52.5'101) 358,520 CF $0.13 $46,249 <br />Raw grinding concrete floor Concrete (0.67"39'37)+(57"952.5'0.67) 2,872 CF $2.65 $7,605 <br />Raw grinding recycle belt conveyor Superstructure 308"6`8 14,784 CF $0.13 $1,907 <br />Blending and kiln feed Superstructure (1452ft~"180.4)+(72`26'79) 409,829 CF $0.13 $52,868 <br />Blending and kiln feed concrete floor Concrete (1452ft2'1 )+(72`26`1) 3,324 CF $2.65 $8,802 <br />Main Stack Superstructure (361'6.6`62.3 )+(32.8"26'39.3) 181,951 CF $0.13 $23,472 <br />Main Stack Concrete Footing Concrete (32.8"26'0.67) 571 CF $2.65 $1,513 <br />Preheater B. Tower Superstructure 351'65.6'62.3 1,434,495 CF $0.13 $185,050 <br />Preheater &Tower Concrete Footing Concrete 6'59'62.3 22,054 CF $2.65 $58,399 <br />Raw mill main baghouse Superstructure 29.5'39.4'79 91,822 CF $0.13 $11,845 <br />Raw mill main baghouse wncrete floor Concrete 29.5"39.4'1 1,162 CF $2.65 $3,078 <br />Kiln Superstructure 151'29.5`82 365,269 CF $0.13 $47,120 <br />Kiln Concrete Footings Concrete (29.5'19.7'6)+(18.7'3.3'6)+(57.4'31`6) 14,553 CF $11.83 $172,166 <br />Coal grinding Superstructure 69`42.7'85.3 251,319 CF $0.13 $32,420 <br />Coal grinding concrete Floor Concrete 69'42.7'0.67 1,974 CF $2.65 $5,227 <br />Clinker cooler Superstructure (49.2`49.2'69)+(88.5'59`69) 527,308 CF $0.13 $68,023 <br />Clinker Cooler Concrete Floor Concrete (49.2'49.2'0.67)+(86.5'59`0.67) 5,120 CF $2.65 $13,558 <br />L-3 7-OS-02 <br />