My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132367
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:08 PM
Creation date
11/26/2007 12:07:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981029
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05.4 RECLAMATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Final Reclamation-Haul Road and Facilities Area <br />Haul Road <br />Sun Coal Company reclaimed the Meadows No. 1 mine haul road and the bond was <br />released March 4, 1989, Mine Facility Map No. 7. With the exception of the loadout, <br />the facilities area was reclaimed in 1983 and 1984. <br />Facilities Area <br />In July 1994, CDMG required Sun Coal Company to submit Technical Revision 15, <br />clarifying the disposition of certain structures and materials at the former facilities and <br />tipple azea of the mine. Based on contacts with the landowner, Mr. John Ei(ts over the <br />years, it was Sun Coal Company's understanding that the existing structures and <br />materials at the facilities and tipple areas were to remain intact for the landowner's use. <br />The following were to be left in place: the office trailer, truck scales and scale house, <br />two water wells and well houses, transformers, weather station, Yampa River bridge, <br />conveyor gallery, coal recovery tunnel, crusher pit and shed, shop buildings and <br />storage tanks, and the north access road from Highway 40 to the shop area. It was <br />determined that the office trailer, Yampa River bridge, shop buildings, and truck scale <br />and scale house were previously agreed to be left in place per a district court settlement <br />agreement. <br />On November 16, 1994, the Colorado Mined Land Reclamation Board held a hearing, <br />requested by Sun Coal Company, to determine the fate of the above remaining <br />structures, based on sworn testimony by the landowner, Mr. John Eilts. At that <br />hearing, under oath, Mr. Eilts identified the structures which he wished to remain. <br />The structures to remain from those present at the facilities and tipple areas included: <br />1) the guard shack <br />2) the permit area entrance gate <br />3) the conveyor gallery <br />4) the coal recovery tunnel <br />5) the coal recovery shack <br />6) the two water wells <br />7) the well house <br />8) any fuel tanks <br />9) all power lines, poles, and remaining transformers <br />10) the gravel yard material at the shop <br />11) the access road from U.S. 40 <br />u <br />Technical Revision 18 338-A Revised 8/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.