My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132353
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:08 PM
Creation date
11/26/2007 12:07:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977310
IBM Index Class Name
Permit File
Doc Name
EXHIBIT B MINING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ • Page 2 <br />All water encountered during development and mining <br />will flow to the main sump which lies southeast of the load- <br />ing pocket. This water will be used by way of jack tanks <br />for drilling and wetting dorm the muckpiles. Any excess <br />water will be stored underground in abandoned slopes down <br />dip from any active operations. <br />The main ventilation will dormcast t}trough the Duggan <br />Adit, with the main fan located in the main drift of the <br />Piineral Joe No. 4 workings. Airtight bulkheads will be ins <br />stalled at strategic locations so as to prevent any contamin- <br />ated air-from entering the fresh air stream from abandoned <br />workings. <br />During t}ie driving of the development drift fresh air <br />will be delivered to the face via 24 inch diameter ventilation <br />tubing. During the production phase, a ventilation cross-cut <br />mill be driven from the trackless ]iaulag "gay to the old work- <br />ings on the Piineral Joe No. 4 and/or No. 5 claim. This cross- <br />cut will also serve as the secondary escaper~ay. Fresh air <br />will be delivered down the Iluggan Adit, through the trackless <br />haulageway to the work faces, then will exhaust out the cross- <br />cut, the old workings and out the i•Iineral Joe No. 4 incline. <br />Auxillary ventilation systems will be set up in the stopes <br />as required. <br />Levels of radon gas concentrations will be monitored <br />and records kept in accordance to I~SA regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.