Laserfiche WebLink
Page 3 <br />Since the rubber tired equipment will be used only as <br />far as the underground transfer point, a main underground <br />shop mould be built near this point. A]_1 servicing and re- <br />pairs would be done at this location so as to avoid moving <br />equipment outside. <br />The main compressors would also be located underground <br />as was done during the previous Climax Uranium operations. <br />SURFACE FACILITIES <br />The surface site will be at the collar of the Duggan <br />Adit, which is located on active mineral lode claims. The <br />present yard will be enlarged with the waste rock from the <br />wldergound development. All buildings, stockpiles and ~•:aste <br />dumps will be on these mineral claims, namely the Mineral Joe <br />rro. 17. <br />The San Miguel Power Company will supply power at 28,800 <br />volts to a privately owned substation located at the Duggan <br />Adit portal site. The power lines are already in place and <br />will only require reactivation. <br />•* <br />Sewage and waste water will be disposed of through a <br />septic tank and leachfield system approved by the Colorado <br />State Public Health Department. Solid waste will be disposed <br />of by burying in the waste rock dump. <br />Liquid storage, primarily fuels and lubricants, will be <br />stored in elevated tanks for gravity feed. These will be <br />located in compliance with MESA regulations. Also, the <br />storage area will be drained so that in case of accidental <br />spillage the fluids will flow into an adequate containment <br />pond and will not enter the natural drainage channels. <br />**Amended 11/29/77 <br />