My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132353
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:08 PM
Creation date
11/26/2007 12:07:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977310
IBM Index Class Name
Permit File
Doc Name
EXHIBIT B MINING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 4 <br />will be constructed approximately 16 feet in diameter and two feet <br />thick, and a fan installed. The fan will be capable of operating <br />as incast or outcast and will stand about three feet high.} <br />Levels of radon gas concentrations will be monitored and <br />records kept in accordance to MESA regulations. <br />Since the rubber-tired equipment will be used only as far as <br />the underground transfer point, a main underground shop would be <br />built near this point. All servicing and repairs would be done at <br />this location so as to avoid moving equipment outside. <br />The main compressors would also be located underground as was <br />done during the previous Climax Uranium operations. <br />{The JD-6 Mine produces a total yearly tonnage of less than <br />70,000 tons of ore and waste combined.} <br />SURFACE FACILITIES <br />The surface site will be at the collar of <br />which is located on active mineral lode claims. <br />will be enlarged with the waste rock from <br />development. All buildings, stockpiles and wastE <br />these mineral claims, namely the Mineral Joe No. <br />the Duggan Adit, <br />The present yard <br />the underground <br />dumps will be on <br />17. <br />The San Miguel Power Company will supply power at 28,800 volts <br />to a privately-owned substation located at the Duggan Adit portal <br />site. The power lines are already in place and will only require <br />reactivation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.