My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132055
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:50 PM
Creation date
11/25/2007 11:49:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Permit File
Doc Date
5/19/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />_____~_~____________________~____.__.._________________..I.___________ <br />Subtotal CK ): <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (S) <br />________I_______~__________________________________________I____________ <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />Demolition <br />4 ~ Seeding ~ 59,319 <br />Fencing <br />5 ~ Nob/Demob ~ f1, 729 <br />Subtotal (N): f11,048 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through N): E27,453 <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (f) <br />________I_________~~____~_____________________________~____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 5333 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ f333 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f2, 145 <br />4. ~ Job Superintendent.. <br />Subtotal (A): fZ,810 <br />TOTAL CONSTRUCTION CONTRACT ANWNT (direct plus 0 8 P): f24,263 <br />____________ <br />B. DNG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (f) <br />________I__________________________________________________I_______._.__ <br />1. ~ Minerals Program Adnin. Fee at 5.00% of cntr.~ 51,213 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B ): 51,213 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f4,024 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 525,477 <br />
The URL can be used to link to this page
Your browser does not support the video tag.