Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont~d Sheet 3 of 4 <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (H): <br />I. EARTHWORK <br />Task No.~ <br />DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task Description ~ Cost (S) <br />Subtotal (1): <br />J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________________________~____________ <br />2 ~ Replace Topsoil ~ f6, 688 <br />Subtotal (J): fb, 688 <br />