My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132055
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:50 PM
Creation date
11/25/2007 11:49:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Permit File
Doc Date
5/19/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br /> <br />PROJECT IDENTIFICATION <br />Agency or organization name OMG <br />Task#. 001 State :Cdaedo PermiUjob#.M-Y000-041 <br />Date: 05r19/t000 Counry:Pueblo Abbreviation :none <br />User: JD7 Site Evans#2 Filename:M047-001 <br />Permit or other joD action' Scedly Shoreline B Stockp/e Area <br />Task description:Reclaim 50 acre Disturbance <br />HOURLY EQUIPMENT COST Banc machine :Ce1 D7H Sedes 2 (7996) Horsepower : 215 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Ceb Shifl basis : 1 per day <br />Attachment no. 2:3~shenk ripper <br />Utilization % Cosl data source : (CRG) <br />Cost Breakdown : Ownershipcost/hour : E35.89 NA <br />Operating cosUhour: 542.70 100 <br />Ripper op. cosUhour: E5.83 700 <br />Operelor cosUhour: 523.12 NA <br />Total unit cosUhour: 5706.93 Tool fleet cosUhr : x106.93 <br />MATERIAL QUANTITIES <br />Seismic <br />method : NA <br />Area <br />method : 13.00 <br />NA <br />Acres <br />Selected estimating method : Arno <br />Load factor : NA Bank volume : lllA BCY <br />Rip depth (fl)' 1.00 volume : $0,973 BCY or CCY <br />Source of quantity takeoff :calculation <br />Source of material load factor : NA <br />Seismic method : Material seismic velocity . NA feet per sewed <br /> Unadjusted houdy production : NA BCV or CCVmr <br />Area method : Average ripping depth per pass : 1.00 feet <br /> Average ripping width per pass : 6.50 feet <br /> Average ripping length per pass : 250.00 feet <br /> Average velocity of machine : 88.00 feet per minute <br /> Aveage machine maneuver time / pau : 0.25 minutes <br /> Houdy production per unit area : 0.724 acres per hour <br /> Unadjusted houdy production' 1,168.30 BCY or CCV/hr <br />Cortection lectors : Unatllustetl houdy production : 1,168.30 BCV or CCY/hr <br /> Site altitude : 4,530 feet <br /> Altitude adjustment: L00 (Ce7 HB) <br /> Job efficiency laaor : 0.83 (1 shiNday) <br /> Net iob correction : 0.83 multiplier <br /> AOlusted hourly unit production : 968.69 BCY or CCV/hr <br /> Adjusted houdy Beet production : 969.69 BCY or CCV/hr <br />JOB TIME AND LOST <br />Fleet size : / Dozers) Total lob time : 21.63 Hours <br />Unit wsl : 50.1 f0 /LCY Total job wst : xs,313 <br />
The URL can be used to link to this page
Your browser does not support the video tag.