Laserfiche WebLink
Phase IVa Weekly Summary No. 3 Page 2 <br />Field Monitoring and Testine Activities <br />003-2203 <br />Golder observed Ames construction activities and noted that clearing and topsoil removal was <br />conducted inside the construction disturbance limits. <br />Laboratory Test Results <br />Golder sampled SLF (SLF-QC1) processed by Ames to conduct quality control testing for gradation, <br />Atterberg Limits, Moisture-Density relationship, and permeability. <br />Meetines <br />CC&V held a Weekly Contractor meeting on Febmary 20~'. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on February 27`x', 2001 <br />at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br /> <br />Bob Nichols <br />Resident CQA Monitor <br />Phase IVe I Febl&i0.doc Golder Associates Inc. <br />