Laserfiche WebLink
~ Associates <br />Febn~azy 27s', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 3: February 18 through February 24, 2001 <br />Cresson Project Phase IVa, Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of February 18ei <br />through February 24a', 2001. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from 12° F to 24° F, with highs ranging from 32° F to 46° F. No precipitation was recorded. <br />Weather observations were made on the four days worked of this seven-day reporting period. <br />Constmction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na <br />construction. Ames conducted Phase Na construction activities on four day of this seven-day reporting <br />period. <br />Ames began to haul topsoil that was previously striped from the overburden stockpile in Upper Arequa <br />Gulch to the designated stockpile location near the secondary crushers. <br />Ames began to cleaz the Phase Na area starting at the southern boundary above the ADR process <br />facility. <br />Ames began to process Soil Liner Fill (SLF) on February 22nd <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />