Laserfiche WebLink
.. <br />~ Associ~2-tes <br /> <br />March 6a', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 4: February 25 through March 3, 2001 <br />Cresson Project Phase IVa, Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase PJa Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of February 25~' <br />through Mazch 3`d, 2001. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 8° F to 19° F, with highs ranging from 35° F to 48° F. Overnight snow was recorded on <br />February 27a' and Mazch 2"d. Weather observations were made on the six days worked of this seven- <br />day reporting period. <br />Constmction Svnonsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa <br />construction. Ames conducted no Phase IVa construction activities during this seven-day reporting <br />period. <br />Field Monitorine and Testing Activities <br />No construction activities to observe. <br />Laboratory Test Results <br />Golder sampled SLF (SLF-QC1) processed by Ames to conduct quality control testing for gradation, <br />Atterberg Limits, Moisture-Density relationship, and permeability. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />