Laserfiche WebLink
Phase IVa Weekly Summary No. 13 <br />the disturbance limits. <br />Page 2 <br />003-2203 <br />Laboratory Test Results <br />No laboratory testing was conducted. <br />Meetines <br />CC&V held a Weekly Contractor meeting on May 15t. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on May 8a', 2001 at <br />10:00 AM. <br />Golder Personnel On-Site <br />~ A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment B. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />PAsse IVa I3 Apri129-M1LYS.doc <br />Golder Associates Inc. <br />