Laserfiche WebLink
,- __. <br />~ -Assoc des <br />May 8a', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />13E: Weekly Summary No. 13: Apri129 through May 5, 2001 <br />Cresson Project Phase IVa, CoustrucHon Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of April 29a' <br />through May Sa', 2001. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from 24° F to 42° F, with highs ranging from 38° F to 73° F. Snow was recorded on May 2"a <br />through Sa'. Weather observations were made on the six days worked of this seven-day reporting <br />period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na <br />construction. Ames conducted Phase Na construction activities on four days (April 30 and May 1 <br />through May 4) of this seven-day reporting period. <br />Ames continued Phase Na construction activities by conducting clearing and grubbing in two locations <br />within the Phase Na area, Ames continued to remove slash from the phase Na area and hauled it to a <br />designated stockpile in Upper Arequa Gulch and hauled topsoil to designated stockpile locations neaz <br />the proposed Highway 67 and the proposed substation. General locations of construction activities are <br />shown on the sketch presented in Attachment A. <br />Field Monitorine and Testing Activities <br />Golder observed clearing of the Phase Na azea and noted that the activities conducted were within <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />