Laserfiche WebLink
Phase IVa Weekly Summary No. l2 Page 2 <br />Field Monitoring and Testing Activities <br />I . Golder observed clearing of the Phase IVa azea and noted that the activities conducted were within <br />the disturbance limits. <br />Laboratory Test Results <br />No laboratory testing was conducted. <br />Meetings <br />CC&V held a Weekly Contractor meeting on April 24a'. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on May 151, 2001 at <br />10:00 AM. <br />Golder Personnel On-Site <br /> <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment B. <br />Sincerely, <br />r~ <br />r, <br />Bob Nichols <br />Resident CQA Monitor <br />I ~ <br />LJ <br />PhewlVe l2 ApriR2-28.doc Golder Associates Inc. <br />