Laserfiche WebLink
~ -= --Golder <br />-Associates <br />May ls`, 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 12: Apri122 through April 28, 2001 <br />Cresson Project Phase IVa, Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of April 22"a <br />. through Apri128a', 2001. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from 14° F to 37° F, with highs ranging from 43° F to 66° F. No precipitation was recorded <br />during this reporting period. Weather observations were made on the six days worked of this seven-day <br />reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na <br />construction. Ames conducted Phase Na construction activities on three days (Apri125 through April <br />27) of this seven-day reporting period. <br />Ames continued Phase Na construction activities by conducting clearing and grubbing in two locations <br />within the Phase Na azea. Ames began to remove slash from the phase Na azea and hauled it to a <br />designated stockpile in Upper Arequa Gulch and hauled topsoil to designated stockpile locations neaz <br />the proposed Highway 67 and the proposed substation. General locations of construction activities aze <br />shown on the sketch presented in Attachment A. <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />