Laserfiche WebLink
Phase IVa Weekly Summary No. 9 Page 2 003-2203 <br />specifications. Structural Fill material placed generally consisted of more than 30% rock retained on <br />the '/<" sieve and is considered un-testable in accordance with ASTM D698. Structural Fill was <br />compacted in accordance with a method specification of four passes (minimum) with a 10-ton <br />vibratory smooth drum compactor. <br />Golder observed clearing of the Phase IVa azea and noted that the activities conducted were within <br />the disturbance limits. <br />Laboratory Test Results <br />No laboratory testing was conducted. <br />Meetines <br />CC&V held a Weekly Contractor meeting on April 3`d. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on April lOw, 2001 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />. Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br /> <br />PAau rva 9 April I-] doc Golder Associates Inc. <br />