Laserfiche WebLink
~ ~ - Assoctes <br />April l Os', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />1tE: Weekly Summary No. 9: April l through Apri17, 2001 <br />Cresson Project Phase IVa, Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase IVa Construction <br />Quality Assurance (CQA} services performed for the Cresson Project during the period of April 151 <br />through April 7a', 2001. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from 21 ° F to 29° F, with highs ranging from 47° F to 58° F. Intermittent snow was recorded on <br />April 6a'. Weather observations were made on the six days worked of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase PJa <br />construction, Ames conducted Phase IVa construction activities on five days of this seven-day <br />reporting period. <br />Ames continued Phase IVa construction activities by conducting subgrade prepazation and slope <br />recontouring in Upper Arequa Gulch between Highway 67 and the existing overburden stockpile. <br />Ames placed Structural Fill borrowed from the mine overburden stockpile. <br />Ames resumed clearing in the Phase IVa area between the existing highway 67 and the ADR facility. <br />Field Monitoring and Testine Activities <br />Golder monitor slope recontouring, including verification of lift thickness, material, compactive <br />effort, moisture content, and maximum particle size for compliance with drawings and <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />