Laserfiche WebLink
Phase IVa Weekly SummaryNo. 8 Page 2 <br />003-2203 <br />the '/4" sieve and is considered un-testable in accordance with ASTM D698. Structural Fill was <br />compacted in accordance with a method specification of four passes(minimum) with a 10-ton <br />• vibratory smooth drum compactor. <br />Laboratory Test Results <br />No laboratory testing was conducted. <br />Meetin¢s <br />CC&V held a Weekly Contractor meeting on Mazch 27~'. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on April 3`d, 2001 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />Phue IVa 8 March2531.doc Golder Associates Inc. <br />