~ Asso des <br />April 17u', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 10: Apri18 through Apri114, 2001 <br />Cresson Project Phase IVa, Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of April 8a' <br />through April 14a', 2001. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 16° F to 26° F, with highs ranging from 35° F to 52° F. Snow was recorded on April 11~' <br />and 12u'. Weather observations were made on the five days worked of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na <br />construction. Ames conducted Phase Na construction activities on three days of this seven-day <br />reporting period. <br />Ames continued Phase Na construction activities by conducting subgrade prepazation and slope <br />recontouring in Upper Arequa Gulch between Highway 67 and the existing overburden stockpile. <br />General locations of construction activities are shown on the sketch presented in Attachment A. Ames <br />placed Structural Fill borrowed from the mine overburden stockpile. <br />Ames continued clearing in the Phase Na azea between the existing highway 67 and the ADR facility. <br />Field Monitorine and Testine Activities <br />Golder monitored slope recontouring, including verification of lift thickness, material, compactive <br />I• <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />