My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131508
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:20 PM
Creation date
11/25/2007 11:15:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Right-of-Entry
Section_Exhibit Name
Tab 3 Appendix 3-4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The rail crossing signs and flashing lights (for each appro+3ch <br />lane) shall be placed on a steel pipe with break away status, ~=he • <br />base shall be 30 inches in the ground and fixed so electric <br />wiring can be run inside of pipe to flashing lights, which shell <br />be mounted 1 foot above sign and controlled to come on only when <br />train is to cross the highway. The sign shall be 36" in diameter, <br />placed 750 feet from the automatic gates, be 7 feet tall from 1:he <br />bottom of the sign to the edge of the asphalt and 12 feet away <br />from the edge of asphalt to edge of sign. <br />No passing lanes shall be installed East and West bound coming <br />into the tracks. Therefore there will be a double yellow line <br />going East from Hayden city limits to the rail crossing, then it <br />will switch to a solid yellow left and broken yellow right f'or <br />the next 900 feet. <br />The concrete bases for the gates (on each side of roadway) shall <br />be placed a minimum of 4 feet from the edge of asphalt and 12 <br />feet from the rail crossing. Mercury vapor lights shall be placed <br />6 feet from the edge of asphalt and 2 feet prior to automatic <br />gates to make crossing mare visible at night. <br />One way traffic shall be maintained thru the construction area at <br />all times when rails are raised to meet the existing asphalt <br />surface and placement of signs and markings are being done. <br />Permittee shall make the crossing as smooth as possible to <br />accommodate snow plowing by maintenance forces. . <br />Attachments to this letter are: <br />83 <br />1. A letter dated October 24, 19A'~ to Robert F. Bevill, Mine <br />Manager for H-G Coal Company, from Robert P. Moston, <br />District Engineer for CDOT. <br />2. Requirements and sketches from the Manual on Uniform <br />Traffic Control Devices and the M & S Standards of tl~e <br />Division of Highways. <br />If you have any question please don't hesitate to contact Larry <br />Matlock or myself at (303) 824-5104. <br />Sincerely, <br />R.P.Moston <br />I(, P, m•fi•N <br />,Regional Tr <br />J.~ Sryce ~Sanburg <br />Highway Maintena <br />xc:R. Moston <br />T. Vaughn <br />F. Holman <br />W. Mauth <br />File (2) <br />rtation Director <br />UJ • ~.71:.~G4~v <br />Superintendent <br />
The URL can be used to link to this page
Your browser does not support the video tag.