Laserfiche WebLink
~' <br />~~`G. Delete the designation old Stage II. <br />w~ H. Relocate bridge to be built across the Lowline Canal From the <br />south end of the property to a point approximately 660 feet <br />north of the south property line. <br />TECHNICAL REVISION #2 <br />~, Technical Revision #1 makes Technical Revision #2 necessary. <br />MINING TIMETABLE (page 5) <br />Mining Stage Years Mined Acres Total Acres <br />' I 7-9 9.47 12.80 <br />II 6-8 8.70 11.91 <br />III 4-6 6.79 9.79 <br />IV 6-7 7.80 10.01 <br />RECLAMATION TIMETABLE (page 11) <br />The lake bank sloping occurs simultaneously with dredgin&; <br />therefore, it is not included as a numbered phase as before. <br />Reclamation Num ber of Ac res +/- _ <br />Phase Years Total Water Revegett-tion <br />I 3-5 12.80 9.19 3.6:1 <br />II 3-5 11.91 8.47 3.41 <br />III 3-5 9.79 6.53 3.2~i <br />IV 3-5 10.01 7.71 2.30 <br />' o~ TECHNICAL REVISION #3 <br />The approximate 8.71 acres, more or less, that lies west of the <br />temporary berm in Stage IV will be used as a site for awash <br />plant, screening operation and specification stockpile area until <br />the completion of excavation in Stage I11. As mining starts in <br />a Stage IV, the washing, screening and stockpiling operations will <br />r'`s`'~ be moved to an off-site location. <br />1~~. <br />2 <br />