Laserfiche WebLink
(b) When required by an order issued under 2.08.3(31: <br />(c) For an alternate postminine land use if the permit is subiect to the provisions of <br />2.05.5(2)(d); or <br />revisions. <br />(d) For ant' extensions [o the area to be covered by a permit. except for incidental boundary <br />RESPONSE <br />TCC is submitting this complete permit revision application for significant alterations in the surface coal mining or <br />reclamation operations described in the original application and approved under the original permit No. C-056-82. <br />(2) A technical envision shall be obtained: <br />(a) For minor hermit modifications which meet the criteria of 1.04(136): <br />(b) When required by an order issued under 2.08.3(3); or <br />(c) For incidental permit boundary revisions. <br />RESPONSE <br />TCC will not implement any revision before obtaining final approval. <br />• (3) A minor revision shall be obtained: <br />(a) For minor permit modifications' which meet the criteria of 1.04(73): or <br />(b) When requested by an order issued under 2.08.3(3). <br />RESPONSE <br />This complete permit revision application addresses all Rules and Regulations applicable for a new permit. <br />(4) The operator may not implement anv permit revision. technical revision, or minor revision before <br />obtaining final approval. <br />(5) Application requirements. An application far all tunes of revisions of a permit shall contain: <br />(a) An identification of the permit h.' hermit number or other appropriate reference which is <br />the subiect of the revision; <br />(b) A specific description of the requested change in the terms of the permit; <br />(c) A specific description of anv chan+:es in the minims and reclamation operation which may <br />have an effect on performance bond requirements of Rule 3: and <br /> <br />Permit Renewal No.3 2.08-2 4/1/99 <br />