Laserfiche WebLink
D~a~ ~Z/~~/~~ IIIIIIIIIIIIIIIIIII <br />V / I 999 <br />5~~ : o <br />2.08 PERMIT REVIEWS, REVISIONS AND RENEWALS AND TRANSFER, SALF AND ASSIGNMENT <br />2.08.1 Scone. 2.08 establishes the requirements for: <br />(I) Revisions ro and affinna[ive periodic review of oennits previously issued by the Division <br />(2) Renewal of oennits previously issued by the Division. <br />(3) Transfer, sale, or assigmnent of rights granted under permits previously issued by the Division. <br />2.08.2 Objectives <br />The objectives of 2.08 are to: <br />(1) Provide procedures for the Division to review, revise, and renew permits; and <br />(2) Provide procedures for transfer, sale, or assigtunen[ of rights granted in permits. <br />RESPONSE <br />Twentymile Coal Company (TCC) is submitting this complete permit application as a permit revision to its <br />previously approved Permit C-056-82 for the mining and reclamation activities associated with life-of--mine <br />operations of the Foidel Creek Mine. This permit revision application is not a renewal, nor does it involve the <br />transfer, assignment or sale of permit rights under a permit previously issued by the CMLRD. Therefore, Rules <br />2.08.1, 2.08.2 and 2.08.4 are the only applicable Sections of 2.08. <br />2.08.3 Division Review of Outstanding Permits. <br />(1) The Division shall review each permit issued and outstanding under these rules during the term <br />of the permit. This review shall occur not later than the middle of the permit tent and as required by 2.06.2 <br />through 2.06.7, pertaining to experimental practices, mountaintop removal, steep slope, and combined surface and <br />underground mining. <br />(2) For oennits of longer than ~-year terms. a review of the permit shall be no less than the pcnnit <br />midterm or every 5 years, whichever is more frequent. <br />(3) After this review, the Division may~for good cause shown, by order, require reasonable revision <br />or modification of the permit provisions to ensure compliance with the Act and these Rules. <br />(4) Copies of the decision of [he Division shall be sent to the permittee. <br />(5) Anv order of the Division requiring revision or modification of permits shall he based upon <br />written findings and shall be subject to administrative and judicial review. <br />2.08.4 Revisions to a Permit <br />(1) General requirements. A revision to a permit shall be obtained: <br />(a) For significant alterations in [hc surface coal mining or reclamation operations described in <br />the anginal application and approved under the original pemtit: <br />Permit Renewal No.3 2.08-I 4/1/99 <br />