Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task a: 002 State :Colorado <br />Dale: 10/252000 ~ County :Huedano _ <br />User: JCS Site :Diamond Rock P%I <br />Permit or other job action :ESTIMATE RECLAMATION COST <br />Task description :SPREAD TOPSOIL <br />PermiVlobp : M•2000-047 <br />Abbreviation :none _ <br />Filename : M047-002 <br />Basic machine : Caf D8N ! 1996) <br />Blade type :Universal <br />Anachment no 1 : ROPS Cab <br />Attachment no. 2 :3-shank hyper <br />Cost Breakdown : Ownership cosVlaur ~ $4 f.3D <br />Operating cosUhour: $55.90 <br />Ripper op. cosUhour: g0.00 <br />Operator cosUhour: 523.12 <br />Total unit cosUhour: $720.32 <br />Horsepower: 285 <br />Shift basis : 1 per day <br />Utilization°; Cost data source: (CRG) <br />NA <br />1Q0 <br />0 <br />NA <br />Total fleet cosVhour: $120.32 <br />Initial Swell Loose <br />volume: 5.522 LCY factor: NA volume: 5,522 LCV <br />Source of quantity take-oN :PERSONAL ESTIMATE <br />Source of est. swell factor: NA <br />Average push distance : 400 feet <br />Unadjusted hourly production : 259 LCY/hr <br />Material consistency description : ' <br />Panty cronsolidaled sroclgiile _ <br />Average push gmdienL 5.00 _(neg) <br />Average site altitude : 5,300 leet ~~, <br />Material weight' 1.600 Ibs/LCY <br />Material weight description <br />Top Soil _~ <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Job Cond t on Correct on Factors <br /> Source <br />Operator skill: _ 0.75 /avg.J <br />~ <br />Matenal consistency: 1.10 fCa1 HBJ <br />Dozing method: 1.00 ~_/gen.J <br />V~sihiliry: 1.00 (avg) <br />Job efficiency : 0.83 ryshih/dayl <br />Spoil pile : 0.70 (!nd-m/) <br />_ <br />Push gradient : _ _ <br />~ 7 77 (Cal HB) - <br />Altitude : 100 (Cat HB) <br />Matenal weight : _ <br />1 44 ~ (Cal HB) <br />_ <br />Blade type: 700 (S or U) <br /> <br />Net correction : 0.77 <br />Adjustetl unit production : 198.79 LCV/hr <br />Adjusted flee) production : 198.79 LCY/hr <br />Totaljob time: 27.78 Hours <br />Unit cost. 50.605 /LCV Total lob cost: $3,342 <br />