Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />_ <br />_ _ <br />Task # : 003 Blale :Colorado PennNlob p : M-2000-047 <br />Date: 10/25/2000 County :HueAano Abbrevialion:none _ <br />User : JCS Sile :Diamond Rack Prl Filename : M047-003 <br />Perms or ocher lob action :ESTIMATE RECLAMATION COST _ <br />Task description :RIP ROADS, PARKING AREAS, STOCKPILE LOCATIONS <br />HOURLY EQUIPMENT COST Basic machine :Car OBN (1996) Horsepower: 285 <br />Blade type :Universal <br />Attachment no 1:gOPS Cab Shift basis: iper tlay <br />Attachment no. 2 : 3-shank upper <br /> Utilization o Cost data source. (GRG) <br />Cost Breakdown: Ownership cosUhour: 54 t.30 NA <br />Operating cosVhour: 555.90 t00 <br />Ripper op. cosMOUr : 56.94 100 <br />Operator cost/hour: 523. lZ NA <br />Total unit cosVhour: 5727.26 To[al fleet cosVhr: $127.26 <br />Selected eslimaung method : Afea <br />Seismic <br />method: NA NA Load factor: NA Bank volume: NA BCY <br />Area - ~ ~ - ~ _ -- _ - <br />method: 0.9: Acres Rip depth (hi: 100 volume: 1,565 BCV ar CCY <br />Source of quantity lake-tiff :PERSONAL ESTIMATE <br />Source of malenal load factor: NA <br />R <br />ON <br />HOURLY P <br />ODUCTI <br />Seismic method : Material seismic velocity : NA leel per second <br />Unadjusted hourly production : NA BCV or CCY/hr <br />Area method : Average npping depth per pass : 7 00 feet <br />Average npping width per pass : 7.OH leer <br />Avemge npping length per pass : 400.00 feet <br />Average velocity of machine : 88.00 leer per minute <br />Averege machine maneuver lime /pass : 0.25 minutes <br />Hourly production per unit area : 0 813 acres per hour <br />Unadjusletl houry production : 7,312.35 BCY or CCY/hr <br />Correcl'on/actors Unadjusted houry production: 1,J72.35 BCY OrCCYM <br />Site altitude : 5,300 leer <br />Altitutle adjustment : 1.00 (Car HBJ _ <br />Job efficiency lector: 0.83 (7 shilVday) <br />Net job correction : 0.83 multiplier <br />Atllustetl houry unit production: 1,089.75 BCY orCCY/hr <br />Adjusted houry fleet production : 1,089.25 BCY or CCYmr <br /> <br />JOB TIME AND COST <br />Fleet sire : / Dozer{sJ <br />Total lob time <br />: 1.44 Hours <br />Unit cost: 50.1 f7 /LCV Total lob cost : $183 <br />