Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Task a: 001 State:Colorado <br />Dale: 10/25/2000 County :Huedano _ <br />User : JCS Site :Diamond Rock Pd <br />Permit or other job action :ESTIMATE RECLAMATION COST <br />Task description :SPREAD SUBSOIUOVERBUROEN <br />PermNjabN : M-2000-047 <br />Abbreviation :none __ <br />Filename : M097-0O1 <br />HOURLY EQUIPMENT COST Basic machine :Cal DeN (1996) Horsepower: 2B5 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab Shift basis : I per day <br />Attachment no. 2 <br />Breakdown : Ownership cosUhour <br />Operating cosVhour <br />Ripper op. cost/hour <br />Operator cost hour <br />Total unit cosVhour <br /> Jab Cond'tion Correction Factors <br />Average push distance : 400 leer Source <br /> ODe2lor skill: _ 075 _ (avgJ <br /> ' Material consistency: _ IJO _ ~. (Cal HB_l <br />Unadjusted hourly protluction ~ 259 LCY/hr ~, Dozing method : 1.00 I (gen 1 _ _ <br />} <br /> Visibility' 7.00 (avg) <br />Material consistency description: Job efficiency:- O.B3 i(lshitUday) <br />Pant' consobdaled smckpile Spoil pile: 070 I (!nd-ml) <br /> _ ~ Push gradient : _ <br />t t7 _ <br />r(Cal HB) <br /> <br />Average push gradient : 5.00 °.° (neg/ Altitude : _ f 00 _ ~(Caf HB) <br /> Matenal weight: f. 10 '. (Cat RBJ <br />Average site altitude: 5,300 feet Blade type: 1.00 (S or U) <br /> <br />Material weight : 2 700 Ibs/LCY Net correction ._ 0.59 <br />Material weight description <br />Earth-Loam Adjusted unit production: i5t.46 LCY/hr <br />3-Shank ripper <br />Utilization °5 Cosl data source : (CRG) _ <br />54 t.30 NA <br />555 90 100 <br />50.00 0 <br />523.12 NA <br />5120.32 Total lleel cosVhour: 5120.32 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 6,000 LCY !actor: NA <br />Source cl quantity take-ofl :PERSONAL ESTIMATE <br />Source el est. swell lector : NA <br />HOURLY PRODUCTION <br />~ Adjusted Ileet protluction : 151.46 LCV/hr <br />JOB TIME AND COST <br />Fleet size : 7 Dozers) <br />Unit cost : 50.794 /LCV <br />Loose <br />volume <br />6,000 LCY <br />Total job lime: 39.62 Hours <br />Total job cost' $4,767 <br />