9708648267 COTTER NUCLR 062 P02 SEP 28 '99 14:02 <br />• <br />~tter Corporation's JD-9 Mine, M-77-306 <br />Page 2 -September 28, 1999 <br />Lek #3 Slope reduction for waste rock stockpile. <br />DMG's cost estimate is 55,557. <br />Cotter's cost estimate is based on a waste rock stockpile size of 13,333 ley. O£thc total, 10,000 <br />Icy would be pushed downhill with a production rate of 357 Icy/hr; and would take 28 hours. The <br />remaining 3,333 ley. of waste rock would be pushed uphill and away from the drainage, using a <br />production raft of 3251cy/hr., it would take 10 hours. The total project would take 38 hours of <br />dozer time at $100lhr. (53,800). <br />Task t14 GrAde pond, vents and shop areas and roads. <br />DMG's cost estimate is $2,594, based upon an estimated 3 acres to be gaded. <br />Ona the waste rock stock pile is contoured, the dump area will be graded on the final pass. <br />Therefore; the total acreage requiring grading will be 2.25 acres instead of 3. Cotter has <br />subtracted the difference from the total cost of task no. 4. <br />Ts'k M~ Replaco topsoil (waste rock fines) <br />The waste rock fines will be spread during the re-contouring efforts, a9 there is no segegation <br />between the fines and the waste rock material. <br />Teak #6 Re-vegetate 5.32 acres, <br />Cotter agees with this cost. <br />Task N7 Mobilization and Demobilization <br />DMG's cost estimate of 51,547. Cotter has deducted 5800 from this estimate, as local <br />contractors do not charge hourly rental rates for their equipment while in transit. <br />~~ Foreman Costs <br />Cotter agrees with DMG's cost estimate of S 1,993. <br />If you have arty questions, please call me at 970-864-7347. <br />Sincerely, <br />COTTER CORPORATION <br />a,~-Q ,~ <br />Dav 'ss <br />Environmental Tech II <br />DD/tit <br />dmadu~9.dd <br />cc: Dave Munger <br />