Laserfiche WebLink
9708648287 COTTER NUCLA 062 P03 SEP 28 '99 14:03 <br />• • <br />3D-9 DMG BOND RECALCULATION COSTS <br />TASK DMG Cotter Difference <br />1 13 082 10 915 2'167 <br />2 6 099 2 121 3 978 <br />3 5 557 3 800 1 757 <br />4 2 594 1 600 994 <br />5 813 813 <br />6 5 555 5 555 0 <br />7 1 547 747 800 <br />8 1 933 1 933 0 <br />Subtotal $ 37 1 BO $ 26 671 $ 10 509 <br /> <br />Public Llabilit Ins. 1.55% 576 413 163 <br />Contractors Ins. 1.55°l° 576 413 163 <br />Contractors rofit 10°~ 3 718 2 667 1 051 <br /> <br />Total Construction $ 42 050 $ 30 164 $ 11 886 <br /> <br />DMG Admin. Fee 5% 2 103 1,508 594 <br /> <br />Grand Total $ 44,153 $ 31,672 $ 12,480 <br />BONDCALC.XLS - JD-9 - 811199 <br />