My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130306
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:17 PM
Creation date
11/25/2007 10:17:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 23 SUBSIDENCE INFORMATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fresh water pond is located above the main access panel, while <br />• sedimentation pond No. 4 is located entirely outside the proposed <br />~ mine plan area (shown on the maps in Appendix A). The fresh <br />water pond consists of an entirely excavated area and contains a <br />synthetic liner to prevent seepage below the pond. The <br />sedimentation pond consists of a partially excavated storage area <br />and an embankment which has a maximum height of slightly less <br />than 10 feet, as measured from the bottom of the channel to the <br />bottom of the spillway. <br />Design of the sedimentation pond and other related surface <br />water control structures are contained in the September 13, 1982 <br />Rocky Mountain Geotechnical report, titled "Redesign of Surface <br />Water Control Structures - Dorchester No. 1 Mine". A copy of <br />this report is included in Attachment A of the permit application <br />(3/83). Impacts to the sedimentation pond and fresh water pond <br />are presented in Section 2.0. <br />1.1.7 Power Lines. Substations and City of Florence Water Line <br />The power lines and power substations 1 and 2, controlled by <br />Southern Colorado Power, are located primarily in the area of the <br />main access portals. Additional lines travel along Road 115. <br />Locations of the power lines and power substations 1 and 2 are <br />shown on the maps included in Appendix A. <br />The City of Florence water line in this area consists of an <br />old clay pipeline which crosses the western portion of the permit <br />area. The source of the water is Newlin Creek. The pipeline is <br />utilized only as a source of supplemental water during periods of <br />. high demand. (Per Comm. Florence City Manager 2/3/83). The <br />location of the diversion point on Newlin Creek is located <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.