Laserfiche WebLink
<br />open lines of communication with Dorchester Colomine personnel <br />so that both operations can continue in a safe and profitable <br />manner. GEC Minerals, Inc. personnel work with Dorchester <br />Colomine personnel on a regular basis to coordinate their <br />engineering and planning functions to ensure the safety of all <br />personnel. In addition, GEC Minerals, Inc. regulates its blasting <br />operations to avoid damage to Dorchester Colomine facilities and <br />personnel. Particular care is taken to promote efficient and <br />safe mining activity at both operations. <br />Subsidence Control Plan. Since GEC Minerals, Inc. does not anti- <br />cipate any underground mining activities this section is not <br />applicable to the GEC Minerals, Inc. operation. <br /> <br />• <br />2.05-43 <br />