Laserfiche WebLink
<br />Table 2.05-1 <br />ANNUAL PRODUCTION SCHEDULE <br /> <br />n <br /> Coal Production Overburden Production <br />Year (Tons) (BCY) <br />1981 150,000 1,500,000 <br />1982 200,000 2,000,000 <br />1983 250,000 2,500,000 <br />1984 300,000 3,000,000 <br />1985 350,000 3,500,000 <br />2.05-44 <br />