My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129731
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:30:43 PM
Creation date
11/25/2007 8:06:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005051
IBM Index Class Name
Permit File
Doc Date
10/31/2005
Doc Name
Financial and Performance Warranty Request
From
DMG
To
ACA Products Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : Opt <br />Date : 10/31/2005 <br />User: ESC <br />State :Colorado PenniUjob# : M-2005051 <br />County :Chaffee Abbreviation :none <br />Site :River Park Recreation Access Filename :M051-001 <br />Agency or organization name :OMG <br />Permit or otherjob action :New 11 <br />Task descripton : MIf10f <br />HOURLY EQUIPMENT COST <br />Permit <br />O/ <br />Basic machine :Cat D8R Sedes ll - 8SU <br />Blade type : Sem6Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : 3-shank dpper <br />Horsepower: 310 <br />Shin basis : 1 perday <br /> Data source : (CRG) <br /> U8lization % <br />Cost Breakdown : Ownership cost/hour : $48.82 NA <br />Opereflng costlhour: x68.09 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cost/hour : 5148.70 Total fleet cosUhour : f 16.70 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 LCY factor : NA volume : 5,000 LCY <br />Source of estimated volume :DMG EsOmate <br />Source of es8mated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly produc0on : 491.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (~ <br />Average site attitude : 7,840 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.818 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1, 00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.22 <br />Altttude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.48 <br />Adjusted unit producflon : 238.00 LCY/hr <br />Adjusted Beet production : 238.00 LCYIhr <br />Total job time : 21.01 Hours <br />Total job cost : 63.082 <br />
The URL can be used to link to this page
Your browser does not support the video tag.