Laserfiche WebLink
CIRCES Cost Estimatinstl Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 1x312005 <br />User : ESC <br />state : Cok~redo PenniTrob# : M-2005051 <br />County :Chaffee Abbreviation :none <br />Site :River Park Recreation Access Filename:M051-002 <br />Agency or organization name :DMG <br />Permit or other job action :New 110 Permit <br />Task description : R6p/ace 6' t' <br />Basic machine :Cat D8R Serfes ll - 8SU <br />Blade type : Seml-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3shank rfpper <br />Cost Breakdown <br /> Utilization % <br />Ownership cost/hour : $48.82 NA <br />Operating cosf/hour : $68.09 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $31.78 NA <br />Total unit cost/hour : $146.70 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3,000 CCY <br />Horsepower: 310 <br />LCY <br />70 <br />Source of estimated volume :Mining Plan Map <br />Source of estimated swell factor :CAT Handook- Earfh Loam <br /> <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 500 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 129.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Matedal consistency description : Job efficiency : 0.83 (1sh18/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (nag) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,840 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/S!I/U) <br />Material weight : 2,100 Ibs/LCY Net conection : 0.61 <br />Weight descdption <br />Earth - Loem <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $1.880 /LCY <br />Swell Loose <br />factor: 1.115 volume: 3,345 <br />Adjusted unit production : 78.88 LCY/hr <br />Adjusted fleet production : 78.88 LCY/hr <br />Total job time : 42.41 Hours <br />Total job cost : $8,221 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />