My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129631
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:30:39 PM
Creation date
11/25/2007 7:58:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991037
IBM Index Class Name
Permit File
Doc Date
4/29/1991
Doc Name
Permit application exhibits
From
PRIDEMORE CONSTRUCTION INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit C - Mining Plan <br />Mining will done during the operating months, as weather permits, between <br />May 15, 1991 through April, 1994. The affected area during mining will be 7.3 <br />acres. The total pit area will be approx. 260' x 450' x 50' max depth. The <br />first area mined will be approx. 150' x 390' x 50' max depth; please see <br />Mining Map. This first phase is located in the existing depression from <br />previous placer operations. The waste material, that which will not be sold <br />as aggregate, from this phase will be placed in two existing intermediate <br />bench areas as noted on the map. These benches are open areas that do not <br />conform to the adjacent bank contour. All excavated material will be classified <br />and stock piled for sale as aggregate as per the Mining Lease requires. The <br />stock piles will be located in the same area as the existing aggregate stock <br />piles, please refer to map. These stock piles are not expected to reach large <br />quantities as sale of aggregate will occur concurrently with mining operations. <br />The second area of excavation is approx. 105' x 450' x 50' max. depth. <br />This phase of the pit is located under the existing ridge of waste placer <br />material. The existing waste material will be back filled into phase one <br />after it's completion. When phase two is cpmpleted, it will be backfilled, <br />sloped, and rounded to the proper slope. <br />As this has been a historically mined area, no additional roads will need <br />to be constructed. All acess roads are in existance. Also, because all the <br />land within the proposed permit boundaries has been mined or disturbed, there <br />is no soil or plant growth on the property. This Land is a rock pile. <br />A settling pond area of 150' x 120' x 15' depth will be constructed to <br />settle the water used from the operation. This settled water will be pumped <br />into a recirculation pond area of 120' x 35' x 10' depth to be recirculated <br />for plant use. <br />All gold extraction will be by means of sorting and washing the gravel. <br />No leaching or chemicals will occur on the property. All water used in the <br />operation will be supplied, as per noted in the mining lease, by the 4cfs of <br />the Platte City Mining Ditch. No water will be released off property. No <br />run off is expected due to the high permeability of the gravel. No disturbance <br />to the hydrolic balance will occur. No ground water will be encountered. All <br />applicable State water laws and regulations will be complied with. <br />
The URL can be used to link to this page
Your browser does not support the video tag.