Laserfiche WebLink
• Page 2 August 11; 2003 <br />6.4.19 EXHIBIT S -Permanent Man-Made Structures <br />19. Exhibit S has been revised to include a commitment to a 50 ft setback and maintenance of <br />3H:1 V slopes adjacent to the Kaneb pipeline. The pipeline will also be staked out as will the 50 <br />ft setback prior to excavation. <br />20. Comments from Dale Smith have been reviewed and a call was made to Dale Smith on Friday <br />August 8, 2003. I explained to Mr. Smith that Coulson will commit to a 50 ft setback and <br />3H:1 V slopes adjacent to the pipeline and he indicated that in that case Kaneb has no problem <br />with the gravel pit. <br />Sihcerely, <br />Peter Wayland <br />President <br />