~~ <br />N <br /> <br />Material stockpiled in the processing site will be used as demand <br />for the material dictates. This material will either be crushed into <br />several gradations to make road base materials or removed directly from <br />the site to be used as subgrade stabilization material or fill material. <br />The crushing operation will not be conducted on a permanent basis, but on <br />a demand basis as the need for the material dictates. An Emissions Permit <br />has been obtained from the Colorado Department of Health to operate the <br />crushing units, a copy of which is enclosed. <br />The anticipated time period to complete mining of Pits I and II will <br />be approximately two months from the start of the mining operation for each <br />pit. These two pits have a combined area of approximately 8 acres. <br />The depth of the overburden is approximately 6 feet, and the natural <br />~•• <br />sand and gravel depth is approximately 12 feet. The material beneath the <br />sand and gravel is Mancos Shale. <br />During the mining and crushing operations, haul roads will be maintained <br />with water trucks to keep dust to a minimum. 23 Road has been paved from <br />[he entrance to the stockpile area north to the Highway, which eliminates <br />dust generated from materials hauled from the processing site. <br />After mining has been completed in Pit Area II, a channel will be dug <br />connecting this pit with the adjacent existing pond to make them one con- <br />tinuous pond. <br />• <br />