My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129099
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:26:11 PM
Creation date
11/25/2007 7:06:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979089
IBM Index Class Name
Permit File
Doc Date
5/14/1979
Doc Name
23 ROAD PIT APPLICATION
From
CORN CONSTRUCTION CO
To
DNR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EXHIBIT E <br />RECLAMATION PLAN <br /> <br />Reclamation of the existing pit area west of 23 Road has been <br />completed and the area has been reclaimed. Vegetation has been re- <br />established along the banks of the pond. <br />The existing pit area east of 23 Road has been partially reclaimed. <br />The banks of the pit have been sloped with a 3:1 (horizontal to vertical) <br />ratio, and topsoil placed on them. Seeding of the slopes and disturbed <br />areas along the bank will be done in the Fall of 1979. <br />When the mining operation has been completed in Pit Areas 1 and II, <br />• <br />they will be left as ponds with a combined surface area of approximately <br />6 acres. Topsoil will be placed on side slopes (minimum depth of six <br />inches) to the water surface elevation. Side slopes of these ponds will <br />be maintained at a ratio of 3:1 from the existing ground surface to 10 feet <br />below the anticipated water surface. It is expected that the water surface <br />elevation will be to S feet below the existing ground level. Side slopes <br />and disturbed areas around the pits will have topsoil placed on them and <br />be seeded in the fall of the year in which they have been excavated. <br />Reclamation of the processing site will be undertaken after the mining <br />activity has been completed and all stockpiled material has been removed <br />from the site. It is anticipated that it will be from six months to a year <br />after mining has been completed. After the stockpiles have been removed, <br />the area will be scarified to loosen the soil, then reseeded. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.